Skip to product information
1 of 7

Supershopbis

Multifunctional 4 Holes Charcoal Pencil Sharpener Long Lead Core Art Drawing Sketching Pencils Manual Sharpener Drawing Supplies

Multifunctional 4 Holes Charcoal Pencil Sharpener Long Lead Core Art Drawing Sketching Pencils Manual Sharpener Drawing Supplies

Regular price $7.99 CAD
Regular price $7.99 CAD Sale price $7.99 CAD
Sale Sold out
Shipping calculated at checkout.
Color
Ships From

SPECIFICATIONS

Brand Name: NoEnName_Null

Origin: Mainland China

Hign-concerned Chemical: None

Age: >6 years old

Type: Standard

4 Holes Sharpener Multi-functional Pencil Sharpener With Lid For Charcoal Pencil Sketch Pencils Art Drawing Supplies 


Bullet Points:

1.4-in-1 Manual Pencil Sharpener: The handheld pencil sharpener is designed with 4 holes. The L hole is suitable for large and thick charcoal pencils, the M hole is suitable for medium pencils, the S hole is suitable for small pencils, and the mini hole is used to sharpen the pencil lead. Can meet your various needs.
2.Proper Size: The size of this multi-functional 4-hole pencil sharpener is approximately 2.36*2.36*1.18 inches, which is very suitable for carrying. And it is made of very high-quality materials, durable and not easily damaged, and can be used for a long time.
3.Complete Equipment: This art sharpener is equipped with a lid and a box to protect the cutter and store pencil shavings. It can maintain the environment clean during use.
4.Multi-uses: This four-hole pencil sharpener has a very wide range of applications, and can be used for sketching, charcoal, and colored pencils. It is very suitable for adults, children and students to use.
5.Perfect Gift: The pencil sharpener is the perfect gift for kids, teachers, students, engineers, children, artists and anyone who needs a pencil sharpener!
Description
1. 4-in-1 manual pencil sharpener: The handheld pencil sharpener is designed with 4 holes. The L hole is suitable for large thick charcoal pencils, the M hole is suitable for medium pencils, and the S hole is suitable for small pencils.
2. Size and material: The size of the manual sharpener is approximately 6 x 6 x 3 cm/ 2.36 x 2.36 x 1.18 inches, made of transparent high-quality materials, durable and not easily damaged, and can be used for a long time.
3. Lid and box: The pencil sharpener is equipped with a plastic lid and box to protect the blades and store pencil shavings. Keep the environment clean during use.
4. Wide range of uses: manual pencil sharpeners can be used for sketching, charcoal, colored pencils, suitable for learning or painting art activities such as adults, children, and students.
5. The pencil sharpener is the perfect gift for kids, teachers, students, engineers, children, artists, and anyone who needs a pencil sharpener!

Specification:
Name: Multifunctional 4 holes Manual Pencil Sharpener with Lid
Material: metal
Size: about 6 * 6 * 3 cm/2.36 * 2.36 * 1.18 inches
Color: as picture shown

Packing List:
1* Manual Pencil Sharpener

Notes:
Due to the lighting effects and shooting angles, there is a color difference in the product, please understand.
Due to manual measurement, there is a tolerance in the product size.
View full details